180X60x25 ruber track for Mini excavator

Short Description:


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 10 Piece/Pieces
  • Supply Ability: 2000-5000 Piece/Pieces per Month
  • Port: Shanghai
  • Payment Terms: L/C,T/T
  • Product Detail

    Product Tags

    Product Detail

    180X60 x 25

    230x96x30
    size width*pitch links size width*pitch links size width*pitch links
    130*72 29-40 250*109 35-38 B350*55K 70-88
    150*60 32-40 260*52.5 74-80 350*56 80-86
    150*72 29-40 260*55.5K 74-80 350*72.5KM 62-76
    170*60 30-40 Y260*96 38-41 350*73 64-78
    180*60 30-40 V265*72 34-60 350*75.5K 74
    180*72 31-43 260*109 35-39 350*108 40-46
    180*72K 32-48 E280*52.5K 70-88 350*109 41-44
    180*72KM 30-46 280*72 45-64 Y320*107K 39-41
    180*72YM 30-46 V280*72 400*72.5N 70-80
    B180*72 31-43 Y280*106K 35-42 400*72.5W 68-92
    H180*72 30-50 300*52.5N 72-98 Y400*72.5K 72-74
    T180*72 300*52.5W 72-92 KB400*72.5K 68-76
    V180*72K 30-50 300*52.5K 70-88 400*72.5KW 68-92
    190*60 30-40 300*52.5KW 72-92 400*73 64-78
    190*72 31-41 E300*52.5K 70-88 400*74 68-76
    200*72 34-47 KB300*52.5 72-92 400*75.5K 74
    200*72K 37-47 KB300*52.5N 72-98 Y400*107K 46
    Y200*72 40-52 JD300*52.5N 72-98 400*78
    230*48 60-84 300*53K 80-96 K400*142 36-37
    230*48A 60-84 300*55 70-88 400*144 36-41
    230*48K 60-84 300*55YM 70-88 Y400*144K 46-41
    230*72 42-56 300*55.5K 76-82 450*71 76-88
    B230*72K 34-60 300*71K 72-76 DW450*71 76-88
    230*72K 42-56 300*72 36-40 450*73.5 76-84
    V230*72K 42-56 BA300*72 36-46 450*76 80-84
    W230*72 300*109N 35-42 450*81N 72-80
    230*96 30-48 300*109W 35-44 450*81W 72-78
    230*101 30-36 K300*109 37-41 KB450*81.5 72-80
    250*47K 84 300*109WK 35-42 K450*83.5 72-74
    250*48.5K 80-88 320*52.5 72-98 Y450*83.5K 72-74
    250*52.5 72-78 320*54 70-84 K450*163 38
    250*52.5N 72-78 B320*55K 70-88 485*92W 74
    250*52.5K 72-78 Y320*106K 39-43 K500*71 72-76
    250*72 47-57 350*52.5 70-92 500*92 72-84
    B250*72 34-60 E350*52.5K 70-88 500*92W 78-84
    B250*72B 34-60 350*54.5K 80-86 K500*146 35
    250*96 35-38

    The Feature of Rubber Track

    230X96
    NX part: 230x48
    continous tracks.jpg
    IMG_5528
    RUBBER COMPOUND

    Production Process

    Track production process

    Why Choose Us

    factory
    mmexport1582084095040
    Gator Track _15

    We currently have 10 vulcanization workers, 2 quality management personnel, 5 sales personnel, 3 management personnel, 3 technical personnel, and 5 warehouse management and container loading personnel.

    Gator Track has built enduring and solid working partnerships with many well-known companies in addition to aggressively growing the market and consistently extending its sales channels. Currently, the company's markets include the United States, Canada, Brazil, Japan, Australia, and Europe (Belgium, Denmark, Italy, France, Romania, and Finland).

    Bauma Shanghai2
    Bauma Shanghai
    French exhibition

    FAQs

    Q: Do you have stocks to sell?

    Yes, for some sizes we do. But normally delivery cost is within 3 weeks for 1X20 container .

    Q: What information should I offer to confirm a size?

    1.  Track Width * Pitch Length * Links
    2. Your machine type (Like Bobcat E20)
    3. Quantity, FOB or CIF price,port
    4. If it is possible, pls also provide with pictures or drawing for double checking.

    Q: Do you offer free samples ? How long does it take for samples?

    Sorry we don’t offer free samples. But we welcome trial order at any qty.

    For future order more than 1X20 container, we will refund 10% of sample order cost.

    Lead time for sample is around 3- 15 days depending on sizes.

    Q. How is your QC done?

    We check 100% during production and after production to ensure a perfect product before shipping.

    Q: How do you ship the finished products?

    -By sea. Always in this way.
    -By air or express, not too much because of the higher price

    Q: What advantages do you have?

    1. Good quality.

    2. Punctual delivery time.

    3. Normally 3 weeks for 1X20 container

    4. Smooth shipping. We have expert shipping department and forwarder, so we can promise faster 

    delivery and make the goods well protected.

    5. Customers all over the world. Rich experience in foreign trade, we have customers all over the world.

    6. Active in reply. Our team will respond your request within 8-hour working time. For more questions 

    and details, pls contact us by email or online.


  • Previous:
  • Next:

  • Write your message here and send it to us